Rediwall Install Timelapse
Onsite at Olive Estate, a lifestyle retirement village located in sunny Nelson. AFS have supplied Rediwall onsite for the intertenancy walls of two-storey units. Take a look at the speed of construction and how simple Rediwall is to install. The timelapse shows the first part of the install, which after is the placing of reinforcing, and next is the concrete pour.
Speed of construction
Over 2 times faster than blockwork
Quality
A structural, fire and acoustic rated wall all in one.
Easy to install
With a team of 3 the lightweight panels are easily into the floor track.
Rediwall Install Guide
Recent Projects
Advice and answers from experienced staff