Installation

AFS Logicwall® permanent formwork wall installation

Installation

Following set out, logicwall® panels are hand lifted into place over a steel floor track and starter bars

Reo and services

The panels are braced using adjustable braces, then plumbed and straightened. Horizontal and vertical reinforcement steel and electrical services are run in the walls.

Core filling

The panels are then core filled by pumping concrete, usually performed from the formed deck of the next slab or off a scaffold.